KINERGY ADVANCEMENT BERHAD (0193.KL)

Sector
Energy
Price
RM 0.375 (0.00%)
Market cap
819.4M MYR

See analyst ratings, target prices and the track record of every expert covering KINERGY ADVANCEMENT BERHAD. Unlock full analyst calls.

About KINERGY ADVANCEMENT BERHAD

Company Description

Kinergy Advancement Berhad, incorporated in 1997 and headquartered in Malaysia, listed on Bursa Malaysia's ACE Market in 2017 before transferring to the Main Market in 2020 under its current name. The Group initially operated as a mechanical and electrical engineering contractor serving commercial, industrial and residential buildings before pivoting in 2018 to establish its Sustainable Energy Solutions segment. Kinergy operates across four business segments: Sustainable Energy Solutions, Engineering Services, Independent Power Producer, and Integrated Facilities Management. Its Sustainable Energy Solutions division spans three pillars, namely Energy Efficiency (chiller optimisation, building management systems, battery energy storage systems), Renewable Energy (solar photovoltaic, hydroelectric, biogas and biomass), and Clean Energy Generation (co-generation, waste heat recovery, power plants). The Group holds operational presence in Malaysia, Thailand and Indonesia, and describes itself as Malaysia's only integrated energy company spanning all four solution pillars.

Business Model

Kinergy's defining feature is its Zero-CAPEX financing model, under which the Group retains ownership of energy assets for a defined concession period while clients pay only for electricity generated at a fixed rate, eliminating upfront capital expenditure for clients and generating both ongoing operations and maintenance fee income and long-duration electricity offtake revenue. It also offers outright purchase and co-ownership financing structures for clients with differing capital constraints. Approximately 80% of Sustainable Energy Solutions projects are secured on a proprietary or preferred-partner basis, reflecting Kinergy's integrated in-house design, fabrication, installation and commissioning capabilities across all technology verticals without subcontracting, which yields tighter margins and stickier client relationships. Engineering, Procurement, Construction and Commissioning revenue is recognised on a project billing basis tied to progress milestones, while the Zero-CAPEX asset portfolio provides a structurally distinct, more durable recurring concession-based income stream.

Revenue Segment

For the Financial Year ended December 2025, the Sustainable Energy Solutions segment contributed approximately 68.6% of total group revenue (RM328.2 million of RM478.3 million), while Engineering Services contributed the remaining approximately 31.1% (RM148.7 million).

Top Client

Named clients and strategic partners include Safran, for whom Kinergy supplies waste heat recovery power to its aerospace and defence manufacturing facility; PETRONAS and PETRONAS Gas Berhad, a strategic joint venture partner on major gas power plant projects in Sabah and Labuan; Inari Technology; AAPICO; Edgeconnex; MahSing; MYDIN; Nextgreen Global, with which Kinergy operates a solar SELCO project; and Roongthavorn Group. Technology and strategic partners named include Turboden, Haier, MTU Power Generation, CGDC Energy China, CNNC, Danajamin, Alliance Bank, BM Solar, Salcon, and the Johor Corporation.

Operational Scale

As of Financial Year 2025, Kinergy has completed or is actively operating 43 Sustainable Energy Solutions projects with a combined installed capacity of 30.99MW across five technology types, while a further 27 projects are active and ongoing with total capacity under execution of 1,753MW, inclusive of the two-phase 750MW Perlis Combined Cycle Gas Turbine development. The Zero-CAPEX asset portfolio spans 28MW across solar, hydro, biogas and clean energy. The Group also maintains over 400 Retrofit and Demand Management Applications sites nationwide for its energy efficiency business, and as at March 2026 held an unbilled order book of RM1.0 billion, equivalent to a 2.09 times cover ratio against Financial Year 2025 revenue.

Associate Companies

Kinergy holds a 51% stake in Jati Cakerawala Sdn Bhd, its vehicle for the Independent Power Producer business, with Thailand's B.Grimm Power PCL holding the remaining 49% as strategic partner; this gives Kinergy an effective approximately 41% indirect economic interest in the 650MW Perlis Combined Cycle Gas Turbine site through Jati Cakerawala's 80% ownership of the plant. The Group also partners with Perbadanan Kemajuan Negeri Perak on a 1,800MW renewable energy pipeline across 29 projects in Perak, and with Permodalan Kedah Berhad on hydropower and solar development rights across six dam sites in Kedah. Its Labuan gas engine power plant project is executed through the KINERGYEH–Sinohydro joint venture.

Latest KINERGY ADVANCEMENT BERHAD news

Top-rated Malaysian stock analysts · Stock screener