CYPARK RESOURCES BERHAD (5184.KL)
- Sector
- Energy
- Price
- RM 0.670 (-4.29%)
- Market cap
- 606.4M MYR
See analyst ratings, target prices and the track record of every expert covering CYPARK RESOURCES BERHAD. Unlock full analyst calls.
About CYPARK RESOURCES BERHAD
Company Description
Cypark Resources Berhad, listed on the Main Market of Bursa Malaysia since 2010, is a pioneer in Malaysia's renewable energy and waste-to-energy sectors. The company operates across four main segments: Integration of Renewable Energy, Construction and Engineering, Green Technology and Environmental Services, and Waste Management, which includes WTE solutions. It completed Malaysia's inaugural WTE plant in Ladang Tanah Merah, Negeri Sembilan, in December 2022. Cypark is an integrated renewable energy and environmental solutions provider with exposure to large-scale solar, WTE assets, and EPCC services, providing end-to-end capabilities from engineering, procurement, construction, and commissioning (EPCC) to operations and maintenance (O&M).
Business Model
Cypark operates as an independent renewable energy asset owner-operator, generating recurring income through long-term Power Purchase Agreements (PPAs) for its solar and WTE assets, as well as tipping fees from landfill operations. The company also earns revenue from Engineering, Procurement, Construction, and Commissioning (EPCC) services for large-scale solar and BESS projects, along with operations and maintenance (O&M) and specialist consultancy services. Its operational structure integrates project development, construction, and asset management. Key advantages include pioneering WTE and hybrid hydro-solar technologies in Malaysia, end-to-end capabilities, and strategic partnerships with entities like Masdar and Petronas Chemical Group for project development.
Revenue Segment
For FY2025, the revenue breakdown by segment was Renewable Energy contributing MYR103 million (65.2%), Waste Management and WTE contributing MYR48 million (30.4%), and Others contributing MYR7 million (4.4%), out of a total revenue of MYR157.8 million.
Geographic Segment
The reports indicate that all operational assets and projects are located within Malaysia, spanning states such as Negeri Sembilan, Kelantan, Terengganu, Johor, Selangor, Kedah, and Perlis. However, a specific percentage breakdown of revenue by geographic segment is not disclosed in the provided documents.
Top Client
Key contracting parties and clients include TNB Power Generation Sdn Bhd, which serves as the off-taker under long-term Power Purchase Agreements for solar assets. Cypark also has strategic partnerships with Petronas Chemical Group (PCG) for developing WTE projects and Terengganu Inc for a hybrid hydro floating solar plant. The government is a major party for WTE concessions and tipping fees.
Operational Scale
As of the most recent reports, Cypark has an installed renewable energy capacity of 400MWp, comprising solar and WTE assets. This includes the 172MWp Merchang LSS3 hybrid solar project, the 98MWp LSS2 Danau Tok Uban floating solar project, and the 15MW SMART WTE plant. Future capacity targets include achieving 800MW by 2027, adding a 100MWac LSS5+ plant scheduled for commercial operation in February 2028, and a 595MWac hybrid floating solar plant at Kenyir Lake targeted for completion in the second half of calendar year 2028.
Associate Companies
Cypark has formed consortiums with Sunview, holding a 49% stake for the LSS5+ project and a 60% effective stake for the 595MWac Kenyir Lake EPCC contract. The company is also joining forces with Petronas Chemical Group (PCG) to develop a SMART WTE project and has a partnership with Masdar for battery energy storage system (BESS) projects. Jakel Capital is a major shareholder with a 21.5% stake, providing financial backing.